基坑开挖设内支撑中出现的问题,有没有大佬知道这是什么原因?
浏览:1850
OVERCONSTRAINT CHECKS:
An overconstraint was detected at node 276 INSTANCE SOIL-1. There are multiple constraints
applied directly or chained constraints that are applied indirectly at this node.
A list of nodes and chained constraints between these nodes that most likely lead
to the detected overconstraint can be printed out to the message file by including
*constraint controls, print=yes in the input file.